Skip to content

Platform 05 · Supporting system

Ground Stations.

Alpha Federal configures fixed, deployable and vehicle-mounted ground control stations and integrates them into a partner nation's existing command architecture, so collection terminates where decisions are actually made rather than in a parallel system nobody uses.

As Alpha Federal configures it

Published airframe figures are not the same claim as what this aircraft does with a sensor turret, an operator station and a downlink aboard. These are the numbers that describe the mission configuration.

Configurations available
Fixed facility, transportable shelter, or deployable case-based kit. Most programs end up with a fixed primary and a deployable secondary, because the exercise that proves the capability is rarely at the main base.
Feeds supported
Live sensor video with metadata, recorded product for post-mission exploitation, and aircraft position and status. Multiple simultaneous aircraft where the program runs more than one orbit.
Operator positions
Scaled to the shift pattern rather than the aircraft count. Sustained operations need enough positions to rotate crews, which is the number most programs get wrong first.
Power & environmental
Conditioned power with UPS and generator backup, and cooling sized for the equipment load. In most partner-nation sites this is the single largest facility cost.
Deployment footprint
From a two-case kit that travels as accompanied baggage up to a containerised shelter. Footprint is chosen against how the customer actually moves equipment, not against what looks impressive.

The station goes where the decision is made.

A ground station that sits outside the command structure creates a second picture that competes with the official one. Integration is the whole job: the feed, the workflow, the product format and the reporting cycle all have to land inside the architecture the commander already trusts.

Infrastructure required

Facility requirement
Secure room with controlled access, conditioned power, cooling and a cable route to the antenna. Physical security accreditation is the customer’s to grant and should start early.
Communications requirement
Line-of-sight datalink to the aircraft, plus terrestrial or satellite connectivity onward to the users of the product. The second link is the one programs forget to budget.
Sustainment model
Spares, scheduled maintenance and a training pipeline for local operators and maintainers. Designed so the customer can run it without us, because that is the point of the program.

Common Questions

Fixed, deployable or vehicle-mounted — how do we choose?

By where the decision gets made and how often that location changes. A fixed station suits a standing command structure with reliable power and communications. Deployable and vehicle-mounted configurations suit programs whose center of gravity moves, at the cost of capacity and comfort. The wrong answer is the one that puts the station somewhere your commanders do not actually work.

Can a ground station integrate with our existing command system?

Yes, and integration is the whole job. The feed, the workflow, the product format and the reporting cycle all have to land inside the architecture your commander already trusts. A station that stands outside it produces a competing picture rather than a better one.

What facility, power and communications does it require?

A secure room with controlled access, conditioned power with UPS and generator backup, cooling sized to the equipment load, a cable route to the antenna, and onward connectivity to wherever the product needs to go. In most partner-nation sites, power conditioning and cooling are the largest facility costs and the most common cause of equipment failure.

How many operator positions does a program actually need?

Scale to the shift pattern rather than the aircraft count, which is the mistake most programs make. Sustained operations need enough positions to rotate crews and to run post-mission exploitation alongside live monitoring. One position per orbit is the figure people budget for, and it is almost always too few to run around the clock.

Who owns the data held at the ground station?

You do. Sortie data is retained under client data ownership protocols with no third-party access. Settle the detail in the contract — retention period, access rights and what happens to the archive at contract end — rather than assuming it.

What does refresh and sustainment look like over five years?

Assume a five-year replacement cycle on workstations and displays, annual software licensing and support, recurring communications costs, and a spares holding that gets consumed. The largest single recurring line is usually bandwidth. We present this as an annual figure during the assessment because it is the number that determines whether the capability survives its third budget round.

Request a Briefing